PI No.:GT2024031902
Technical parameter
[1]These trainer kits should provide students who have completed basic refrigeration theory with an opportunity to build their own operational system.
[2]Including all necessary materials required in order to make a complete operational refrigeration or A/C system
[3]Including standard commercial and industrial components such as compressors, condensing units, tubing, sight glasses, evaporators, expansion devices, thermostats, control, etc.
 
all necessary materials
Compressor 1
Air conditioning condenser(including fan)1
Air conditioning evaporator(including fan)1
Filter 1
Liquid reservoir 1
Expansion valve 1
Stop valve 2
Solenoid valve 1
Copper pipe(8mm)1set
Copper pipe(10m)1set
High pressure gauge 1
Low pressure gauge 1
Pressure controller 1
Refrigerant R22 1
Liquid filling meter 1
Liquid filling valve 1
Table 1
Set of operating tools
Hydroscope 1
transparent organic box 1 set

Send Message

  • You can only upload 1 attachments at most
  • Supported formats: PDF,JPG,PNG,EXCEL,WORD,STP,IGS,DWG,DXF,PDF,STEP
  • The size of the uploaded file should not exceed 10MB