
Air conditioner installation and maintenance training device
GTRT-0004
Technical parameter
1. Dimension: About 950mm × 800mm × 1750mm
2. Working power: AC220V, 50HZ
3. Rated power: ≤1.5KW
4. Structure: The entire system is mounted on the mobile aluminum profile frame with universal wheel.
1. Dimension: About 950mm × 800mm × 1750mm
2. Working power: AC220V, 50HZ
3. Rated power: ≤1.5KW
4. Structure: The entire system is mounted on the mobile aluminum profile frame with universal wheel.
Delivery
EXW
minimum order
1 set
Supply Ability
30set / Month
Country of Origin
Guangzhou,China
Stock Time
45Day
Quantity
This vocational training equipment air conditioner installation and maintenance trainer can be used as teaching equipment to train students to master the theoretical knowledge and practice skills of design, installation, commissioning and maintenance of air conditioning system. The teaching equipment air conditioner installation and maintenance trainer vocational training equipment is also suitable for the teaching and skills training of related majors in higher vocational colleges and secondary vocational colleges. Meanwhile, the teaching equipment air conditioner installation and maintenance trainer vocational training equipment can also be used as an assessment device for skill training and skill appraisal in technical schools, vocational education centers, and vocational qualification appraisal stations.
Technical parameter
1. Dimension: About 950mm × 800mm × 1750mm
2. Working power: AC220V, 50HZ
3. Rated power: ≤1.5KW
4. Structure: The entire system is mounted on the mobile aluminum profile frame with universal wheel.
Product composition
No. | Name | Specs | QTY |
1 | Air conditioning installation and maintenance training | Power is more than 1H; | 1 pcs |
2 | Portable welding torch | 1 pcs | |
3 | Vacuum pump | 1 pcs | |
4 | Refrigerant recycling machine | 1 pcs | |
5 | Experiment manual | 1 pcs |
Training courses
1. Installation of split air conditioner
2. Power test of split air conditioners
3. Fault code analysis of split air conditioners
4. Charging and recycling of refrigerants
5. Use of Vacuum Pump
6. Operation of portable welding torch
7. Practice of split air-conditioning installation procedures
SEND MESSAGE